Short answer: assess the existing floor, remove poorly bonded coatings by grinding or shot blasting, repair the slab and joints, check moisture, then apply a new resin system suited to use before redoing the marking.
1. Diagnose
Why did the floor fail? Underestimated traffic, poor preparation, slab moisture, aggressive chemicals? The answer guides the new system.
2. Prepare the floor before resin
- Stripping: diamond grinding or shot blasting to remove the old coating and open the concrete.
- Degreasing: essential in workshops.
- Repairs: cracks, spalls, holes.
- Joints: expansion joints redone with a flexible product.
- Moisture: checked before application.
- Vacuuming: complete dust removal.
3. Apply the new system
Primer, then resin coats (thin film, multi-layer or self-levelling) according to demands, with an anti-slip finish if needed.
4. Mark and return to service
New traffic plan, then return to service after the curing time stated by the manufacturer.