Car park with resin floor and painted traffic lane

Anti-slip flooring · Sale

Anti-slip flooring in Sale

Reducing slip risk on ramps, wet areas and commercial kitchens.

COLOR HOME carries out anti-slip flooring projects in Sale, from our Casablanca office and by appointment. Wet, greasy or sloping areas carry a slip risk.

Apartment buildings, residences and homes on the right bank of the Bouregreg.

Local context in Sale

Salé has a large stock of apartment buildings and residences, plus its historic medina. Facade and common-area renovations are frequent.

The city also hosts business zones, including Technopolis.

Services offered

An anti-slip resin floor is made by broadcasting or mixing aggregates (silica, corundum…) into a resin coat and locking them in with a sealing coat. The resulting texture improves grip, especially when wet.

  • Car park ramps
  • Commercial kitchens and laundries
  • Wet production areas
  • Pool surrounds (system-dependent)
  • Technical stairs and landings

Preparation and application

Risk analysis

Water, grease, slope, footwear or wheel type.

Preparation

Mechanical slab preparation.

Resin coat

Base coat applied.

Broadcasting

Mineral aggregates of suitable grade.

Seal coat

Aggregates locked in and finished.

Gallery

Job-site photos and illustrations

The exact location of the projects shown is not stated.

Frequently asked questions

Do you provide anti-slip flooring in Sale?

Yes. We work in Sale by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.

Do you renovate building common areas in Sale?

Yes: lobbies, stairwells, facades and car parks, scheduled around residents’ daily life.

Is an anti-slip floor hard to clean?

The rougher the texture, the more suitable cleaning equipment is needed. We choose the minimum roughness required.

Can an existing floor be made anti-slip?

Often yes, by applying an anti-slip coat over a sound, prepared coating.

Quote request

Free and with no obligation. We usually reply within 2 business days.

  1. 1. Project
  2. 2. Details
  3. 3. Contact
Project

Project type