Light grey self-levelling resin floor

Self-levelling resin · Nador

Self-levelling resin in Nador

A perfectly smooth, seamless surface for a modern look and simple maintenance.

COLOR HOME carries out self-levelling resin projects in Nador, from our Casablanca office and by appointment. Self-levelling resin flows out on its own to form a flat, smooth surface a few millimetres thick.

Mediterranean coast and lagoon: facades, residences and port sites.

Local context in Nador

Nador, on the Marchica lagoon, has humidity and salty air. The area is growing with new residential and port projects.

Facades and metal structures need suitable protection.

Services offered

A self-levelling floor is a resin poured a few millimetres thick that levels itself before curing. It forms a seamless, smooth surface, thicker and tougher than floor paint.

  • Showrooms and shops
  • Light production and clean workshops
  • Restaurants and kitchens (with suitable finish)
  • Contemporary interiors
  • Plant rooms

Preparation and application

Slab check

Moisture, flatness, cohesion.

Preparation

Grinding or shot blasting, levelling major defects.

Primer

Primer, possibly sand-broadcast, for adhesion.

Pouring

Resin poured and de-aired with a spiked roller.

Finish

Matt, satin or gloss protective topcoat according to use.

Gallery

Job-site photos and illustrations

The exact location of the projects shown is not stated.

Frequently asked questions

Do you provide self-levelling resin in Nador?

Yes. We work in Nador by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.

What protection for facades in Nador?

Cleaning, crack treatment, primer and facade paint suited to marine exposure.

How thick is a self-levelling floor?

Usually a few millimetres, depending on product and expected demands.

Is self-levelling resin slippery?

Its smooth finish can be when wet; an anti-slip topcoat can be applied where needed.

Quote request

Free and with no obligation. We usually reply within 2 business days.

  1. 1. Project
  2. 2. Details
  3. 3. Contact
Project

Project type