Car park with resin floor and painted traffic lane

Anti-slip flooring · Laayoune

Anti-slip flooring in Laayoune

Reducing slip risk on ramps, wet areas and commercial kitchens.

COLOR HOME carries out anti-slip flooring projects in Laayoune, from our Casablanca office and by appointment. Wet, greasy or sloping areas carry a slip risk.

Desert climate: facades exposed to sun and sand.

Local context in Laayoune

In Laayoune, intense sunshine and sand-laden winds put heavy demands on facades. Choosing durable exterior paints and preparation are essential.

The city is growing with housing, facilities and administrative buildings.

Services offered

An anti-slip resin floor is made by broadcasting or mixing aggregates (silica, corundum…) into a resin coat and locking them in with a sealing coat. The resulting texture improves grip, especially when wet.

  • Car park ramps
  • Commercial kitchens and laundries
  • Wet production areas
  • Pool surrounds (system-dependent)
  • Technical stairs and landings

Preparation and application

Risk analysis

Water, grease, slope, footwear or wheel type.

Preparation

Mechanical slab preparation.

Resin coat

Base coat applied.

Broadcasting

Mineral aggregates of suitable grade.

Seal coat

Aggregates locked in and finished.

Gallery

Job-site photos and illustrations

The exact location of the projects shown is not stated.

Frequently asked questions

Do you provide anti-slip flooring in Laayoune?

Yes. We work in Laayoune by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.

Do you work in Laayoune?

Yes, after assessment and by appointment; logistics are organised according to the project size.

Is an anti-slip floor hard to clean?

The rougher the texture, the more suitable cleaning equipment is needed. We choose the minimum roughness required.

Can an existing floor be made anti-slip?

Often yes, by applying an anti-slip coat over a sound, prepared coating.

Quote request

Free and with no obligation. We usually reply within 2 business days.

  1. 1. Project
  2. 2. Details
  3. 3. Contact
Project

Project type