Light grey self-levelling resin floor

Self-levelling resin · Khenifra

Self-levelling resin in Khenifra

A perfectly smooth, seamless surface for a modern look and simple maintenance.

COLOR HOME carries out self-levelling resin projects in Khenifra, from our Casablanca office and by appointment. Self-levelling resin flows out on its own to form a flat, smooth surface a few millimetres thick.

Middle Atlas: buildings facing cold winters.

Local context in Khenifra

Khenifra, in the Middle Atlas, has cold winters. Frost and moisture stress facades, which need careful repairs before painting.

Projects mainly concern homes, shops and facilities.

Services offered

A self-levelling floor is a resin poured a few millimetres thick that levels itself before curing. It forms a seamless, smooth surface, thicker and tougher than floor paint.

  • Showrooms and shops
  • Light production and clean workshops
  • Restaurants and kitchens (with suitable finish)
  • Contemporary interiors
  • Plant rooms

Preparation and application

Slab check

Moisture, flatness, cohesion.

Preparation

Grinding or shot blasting, levelling major defects.

Primer

Primer, possibly sand-broadcast, for adhesion.

Pouring

Resin poured and de-aired with a spiked roller.

Finish

Matt, satin or gloss protective topcoat according to use.

Gallery

Job-site photos and illustrations

The exact location of the projects shown is not stated.

Frequently asked questions

Do you provide self-levelling resin in Khenifra?

Yes. We work in Khenifra by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.

Which season to paint a facade in Khenifra?

Spring and late summer are generally best; frost and rain are avoided.

How thick is a self-levelling floor?

Usually a few millimetres, depending on product and expected demands.

Is self-levelling resin slippery?

Its smooth finish can be when wet; an anti-slip topcoat can be applied where needed.

Quote request

Free and with no obligation. We usually reply within 2 business days.

  1. 1. Project
  2. 2. Details
  3. 3. Contact
Project

Project type