Applying epoxy resin with a squeegee

Industrial floor renovation · Kenitra

Industrial floor renovation in Kenitra

Repair the slab, deal with the old coating and get back to work quickly.

COLOR HOME carries out industrial floor renovation projects in Kenitra, from our Casablanca office and by appointment. Flaking coating, cracked slab, damaged joints, faded marking: a worn industrial floor harms safety, cleanliness and the site’s image.

Industrial and residential city: business zones, homes, facades.

Local context in Kenitra

Kenitra has become an industrial hub, notably with its free zone and automotive industry. Commercial buildings need floors and paints suited to their processes.

The city is also seeing strong residential growth.

Services offered

Industrial floor renovation means assessing the existing floor, removing poorly bonded coatings, repairing the slab (cracks, spalls, joints), then applying a new resin system suited to use and redoing the marking.

  • Flaking or worn epoxy floors
  • Cracked or spalled slabs
  • Damaged expansion joints
  • Change of use of a zone
  • Faded marking

Preparation and application

Diagnosis

Existing adhesion, slab condition, moisture, cause of damage.

Stripping

Grinding or shot blasting to remove the old coating if needed.

Repairs

Cracks, holes, spalls and joints repaired.

New system

Primer and resin suited to the new use.

Marking

New traffic plan and signage.

Gallery

Job-site photos and illustrations

The exact location of the projects shown is not stated.

Frequently asked questions

Do you provide industrial floor renovation in Kenitra?

Yes. We work in Kenitra by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.

Do you work in Kenitra’s industrial zones?

We assess industrial requests case by case, after a technical visit.

How is an industrial floor renovated?

Diagnosis, removal of loose areas, slab and joint repair, then a new resin system and marking. See our guide on the blog.

Can the old coating be covered over?

Yes if it is well bonded and compatible, after sanding. Otherwise it must be removed.

Quote request

Free and with no obligation. We usually reply within 2 business days.

  1. 1. Project
  2. 2. Details
  3. 3. Contact
Project

Project type