Self-levelling resin · Agadir
Self-levelling resin in Agadir
A perfectly smooth, seamless surface for a modern look and simple maintenance.
COLOR HOME carries out self-levelling resin projects in Agadir, from our Casablanca office and by appointment. Self-levelling resin flows out on its own to form a flat, smooth surface a few millimetres thick.
Hotels, residences and villas in the Souss seaside capital.
Local context in Agadir
Agadir concentrates hotels, tourist residences and villas exposed to strong sun and sea air. Regular renovation of facades and common areas is essential.
The region also hosts business zones linked to agri-food industry and the port.
Services offered
A self-levelling floor is a resin poured a few millimetres thick that levels itself before curing. It forms a seamless, smooth surface, thicker and tougher than floor paint.
- Showrooms and shops
- Light production and clean workshops
- Restaurants and kitchens (with suitable finish)
- Contemporary interiors
- Plant rooms
Preparation and application
Slab check
Moisture, flatness, cohesion.
Preparation
Grinding or shot blasting, levelling major defects.
Primer
Primer, possibly sand-broadcast, for adhesion.
Pouring
Resin poured and de-aired with a spiked roller.
Finish
Matt, satin or gloss protective topcoat according to use.
Gallery
Job-site photos and illustrations
The exact location of the projects shown is not stated.
Frequently asked questions
Do you provide self-levelling resin in Agadir?
Yes. We work in Agadir by appointment, after a discussion or technical visit. The quote details preparation, products and schedule.
Do you renovate hotels in Agadir?
Yes, floor by floor or wing by wing, outside peak periods, so guests can still be welcomed.
How thick is a self-levelling floor?
Usually a few millimetres, depending on product and expected demands.
Is self-levelling resin slippery?
Its smooth finish can be when wet; an anti-slip topcoat can be applied where needed.
Related services
Quote request
Free and with no obligation. We usually reply within 2 business days.
- 1. Project
- 2. Details
- 3. Contact