Short answer: prepare an industrial painting project by listing production and safety constraints, dividing the site into zones, choosing systems suited to each substrate and use, then scheduling work during shutdowns or off-hours.
Site manager’s checklist
- Surface inventory: walls, ceilings, steelwork, floors, by zone and substrate.
- Production constraints: sensitive zones, process, possible shutdowns.
- Health and safety: site rules, work permits, barriers, ventilation.
- Surface use: abrasion, washing, humidity, chemical exposure.
- System selection: based on manufacturers’ data sheets.
- Phasing: zone order, access, equipment storage.
- Handover: inspection criteria by zone, product references supplied.
Which paint for a factory?
There is no single answer: washable finishes for walls exposed to dirt, anti-corrosion systems for steelwork, traffic-rated resins for floors.